LCC Early Action (Little Cottonwood Canyon)

Company

Staker Parson Materials & Construction

Project Type

Asphalt

Excavation

Location

South Wasatch Front

Owner: Ìý
General Contractor:ÌýStaker ParsonÌý
Start Date:ÌýMay 2020Ìý
Completion Date:ÌýÌý Nov 2020Ìý
Subcontractors or Key Contractors:Ìý B. Jackson Engineering & Construction, B & K Construction, Premier Striping INC, Geneva Rock Products

 

On one of the most dangerous and busiest highways in the State of Utah, US-6, Staker Parson Materials & Construction was able to safely mill & overlay the highway stretch during the night hours from May to September 2020. Working within a 9-hour nightly mill and overlay shift, our traffic control, trucking, asphalt plant, and construction crews were successfully able to rotomill 4″ of existing asphalt and pave back 2.5″ of hot mix asphalt (HMA). Upon completing the HMA phase of 28,134 tons, we paved back 18,553 tons of Stone Matrix Asphalt (SMA) on 17 lane miles, with only two bumps to grind.

 

Materials Used & Quantities:Ìý

  • 28,134 tons of 12.5mm PG 64- 34 75 Gyro (25% RAP W/ Lime) HMAÌý
  • 18,553 tons of 12.5mm PG 70- 28 W/ Lime of Stone Matrix Asphalt (SMA)Ìý
  • Chip Seal Coat, LightweightÌý251,269 square yardÌý
  • RotomillingÌý– 4 InchÌý220,621 square yardÌý
  • Micro-SurfacingÌý–Ìý52,348 square yardÌý